Difference between revisions of "C-CWEL Spring Calendar"
From CoolWiki
Jump to navigationJump to searchm |
m |
||
Line 6: | Line 6: | ||
*<strike>March 27 - Review of our as-submitted proposal, along with (hopefully) comments from reviewers. Read [[C-CWEL Source Matching Work]] in prep for this, discuss it here.</strike> | *<strike>March 27 - Review of our as-submitted proposal, along with (hopefully) comments from reviewers. Read [[C-CWEL Source Matching Work]] in prep for this, discuss it here.</strike> | ||
*<strike>April 3 - '''Journal Club #1''' (Wendi) - Ogura et al. 2002. In real time (using join.me or something else), check last few sources that CWAYS said didn't have matches to verify. Start assembling "[[Wendi's table of all data sources]]"; add to this table at the end of each JC week.</strike> | *<strike>April 3 - '''Journal Club #1''' (Wendi) - Ogura et al. 2002. In real time (using join.me or something else), check last few sources that CWAYS said didn't have matches to verify. Start assembling "[[Wendi's table of all data sources]]"; add to this table at the end of each JC week.</strike> | ||
− | *April 10 - NO TELECON? - Robert, Wendi at NSTA in TX; Christi out | + | *<strike>April 10 - NO TELECON? - Robert, Wendi at NSTA in TX; Christi out</strike> |
*April 17 - '''Journal Club #2''' (Mike) - Getman et al. 2007 | *April 17 - '''Journal Club #2''' (Mike) - Getman et al. 2007 | ||
*April 24 - NO TELECON? - Wendi out. Luisa out. | *April 24 - NO TELECON? - Wendi out. Luisa out. |
Revision as of 15:56, 16 April 2013
In general, if we're missing only one person, even me, just fine to hold meeting if needed! If we are missing >1, then it becomes a judgement call as to whether or not to hold the meeting.
March 13 - NO TELECON - Luisa outMarch 20 - NO TELECON - Robert out, Wendi may be out - IASC tutorial so we're trumped anyway. If you have time and inclination, go listen to that, or the ds9 tutorial from January. We will be using ds9, so you might as well get up to speed...March 27 - Review of our as-submitted proposal, along with (hopefully) comments from reviewers. Read C-CWEL Source Matching Work in prep for this, discuss it here.April 3 - Journal Club #1 (Wendi) - Ogura et al. 2002. In real time (using join.me or something else), check last few sources that CWAYS said didn't have matches to verify. Start assembling "Wendi's table of all data sources"; add to this table at the end of each JC week.April 10 - NO TELECON? - Robert, Wendi at NSTA in TX; Christi out- April 17 - Journal Club #2 (Mike) - Getman et al. 2007
- April 24 - NO TELECON? - Wendi out. Luisa out.
- May 1 - NO TELECON? - Luisa out.
- May 8 - Journal Club #3 (Robert) - Beltran et al. 2009
- May 15 - (Robert might be out?) - Journal Club #4 (Larua) - Choudhury et al 2010 and JUST THE BRC 38 portion of Chauhan et al. 2009
- May 22 - Journal Club #5 (Christi) - Barentsen et al. 2011 and Nakano et al 2012.
- May 29 - Journal Club #6 (John) - JUST APPENDIX of Koenig et al. 2012 (not Robert, big deadlines at his end?) Want to try the color cuts yourself? This paper has a catalog of likely YSOs, so most of these should pass all of the cuts in Koenig et al. OR, search in the WISE archive and get our actual catalog (20 arcmin radius from the BRC38 coordinates).
- June 5 - JC overflow or C-CWEL Resolution Worksheet - Source Resolution Work #1
- June 12 - C-CWEL Resolution Worksheet - Source Resolution Work #1 or 2
- June 19 - Source Resolution Work #2/overflow
- June 26 - tbd