C-CWEL Fall work

From CoolWiki
Revision as of 18:34, 29 August 2013 by Rebull (talk | contribs) (Created page with "=Reminder of the to-do items and timeline= To do items: #Inspect images of all 115. #Find obj with Spitzer data, look at obj in those images, get photometry. #Make and inspec...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Reminder of the to-do items and timeline

To do items:

  1. Inspect images of all 115.
  2. Find obj with Spitzer data, look at obj in those images, get photometry.
  3. Make and inspect SEDs of all 115.
  4. Make CMDs/CCDs, inspect location of objects.
  5. Add objects back into cycle (optional) based on CMD/CCD.
  6. Collect all opinions on images, SEDs for all objects, make decisions on each object.
  7. Compare `new' objects to literature, SIMBAD to check.
  8. (Fit SEDs, compare to other regions...)

Time constraints:

  1. Need to print before Christmas
  2. Need to start writing poster in earnest at Thanksgiving weekend.
  3. Need to have enough of an answer to write abstract due 1 October.

Image inspection

Need to look at images at all available bands for our 115.

Lots of spreadsheets flying around email.

For POSS, 2MASS, WISE, we have the FinderChart tool.

For Spitzer, there are several solutions. File:Flowchart.pdf document from email 8/28, and screencapture movie.